What Happens on Roof Replacement Day, Hour by Hour

Roof replacement day is the part homeowners worry about most: the noise, the strangers on the roof, the old shingles flying off, the open roof over the house. Most of that worry goes away once you know what actually happens, and in what order.
Here is a time-lapse of a typical first day on a shingle roof replacement, from the first tarp to the last magnet sweep, what you will hear and see along the way, what happens in the days after, and what to do if something comes up. Every roof is different, so read this as a typical day, not a schedule.
Before the Day
By replacement day the permit has been pulled and posted, the shingle and color are named in your written scope, and the start date is set. The driveway is clear, cars are on the street, and anything fragile on the walls or in the attic is put away.
Our guide to preparing for a roof replacement has the full checklist for the week before.
Replacement Day, Hour by Hour

Arrival and protection. The crew arrives, the bin or truck is placed and tarps go down over the landscaping and along the sides of the house before anything comes off the roof.
The first hours: tear-off. The old roof comes off, every layer down to the deck, starting at the top and working down. Debris goes straight to the bin or truck. This is the loudest part of the day.
The deck, exposed. With the old roof off, the deck is checked
Any soft or damaged sections are photographed, explained to you and replaced as your written scope says.
Dry-in. Drip edge goes on at the eaves and new underlayment covers the bare deck, so the house is protected again.
Flashings and vents. Valleys, walls, chimneys, pipe boots and vents get new flashings and are set for the new roof.
Shingles go on. Starting at the eaves and working up, course by course, around every vent and flashing.
Cleanup. Tarps come up, debris is cleared, and the yard, driveway and street get a magnetic sweep for nails.
Protected for the night. Whatever isn’t finished is left protected, so the house is weathertight overnight.

How far the first day gets depends on the size of the roof and what the deck needs. Most home roof replacements take 3 to 5 days in all.

What You’ll Hear, See and Notice
Loud scraping and thuds
- What it is
- The old roof coming off
- Good to know
- The loudest part, and usually the first hours
Nail guns
- What it is
- The new roof going on
- Good to know
- Steady but less jarring than the tear-off
Vibration and dust in the attic
- What it is
- Work right above the ceiling
- Good to know
- Cover what is stored in the attic and clear tall shelves
A bin or truck out front
- What it is
- Where the old roof goes
- Good to know
- Keep the driveway clear for it
Tarps over your plants
- What it is
- Protection for the landscaping
- Good to know
- They come up at the end of the day
A roofer at your door
- What it is
- Usually about the deck, or a question about the scope
- Good to know
- Photos of anything found are shown to you before it is fixed

Days Two to Five

The rest of the shingles, and the ridge caps along the top of the roof.
Flashings finished at every wall, chimney and penetration, and vents completed.
Cleanup every day, with magnetic sweeps of the yard, the driveway and the street.
The inspection, booked with the building department under the permit.
The final walkthrough, where we walk the roof and the property with you.
Our guide to the whole roof replacement process explains the decisions that come before the work starts.
What If…
Which of these sounds most like your roof? Tap a card.
Rain is in the forecast
What happens
Work pauses and the roof is protected until it is dry enough to continue
What to do
Nothing, beyond keeping the crew’s number handy
Damaged deck is found
What happens
It is photographed and explained, then replaced as your written scope says
What to do
Look at the photos and ask questions
You need to leave for the day
What happens
The work continues; you can be reached by phone
What to do
Leave gates open and pets inside
Something lands in the yard
What happens
It is picked up during the day and in the end-of-day cleanup
What to do
Point it out to the crew
You have a question about the work
What happens
Your roofer answers it
What to do
Ask; it is your roof

Your Replacement Day Checklist

How We Run Replacement Day
A TotalShield® shingle roof replacement is built from the deck up: the old roof comes off, the deck is checked and photographed, and new underlayment, flashings, drip edge, ventilation and shingles go on. We pull and post the permit, tarp the landscaping, sweep for nails every day and finish with a walkthrough. Installs are backed by our 10-year workmanship warranty (call for details).

For a tile roof, see tile roof replacement; for a flat roof, flat roof replacement.
Frequently Asked Questions
How long does a roof replacement take?
Most home roof replacements take 3 to 5 days. The first day is usually the tear-off, the deck and getting the house protected again; the rest is the new roof, the flashings, the cleanup and the walkthrough.
Do I need to be home on roof replacement day?
Not necessarily. Leave gates open and keep your phone handy in case your roofer has a question, especially about the deck.
Is my house left open overnight?
No. Whatever isn’t finished at the end of the day is left protected, so the house is weathertight overnight.
What if it rains during my roof replacement?
Work pauses and the roof is protected until it is dry enough to continue. That is part of why a replacement is planned over several days.
How loud is a roof replacement?
The tear-off is loud, with scraping and thuds overhead. Nail guns follow when the new roof goes on. Most homeowners keep pets inside or away for the day.
Will there be nails in my yard afterward?
The yard, driveway and street get a magnetic sweep at the end of every day, and again before the final walkthrough.
Ready to Plan Your Replacement Day?
Book a free roof evaluation. A roofer looks at your roof, tells you in plain English whether it needs a repair or a replacement, and gives you a written scope and price before any work. Or call (310) 340-1643.
Part of our roof replacement guide.